Features of our Room 514
- There is 1 double bed and 1 large sofa in the room. It can also be used as 2 single beds upon request.
- Maximum 2 people can stay.
- All rooms of our hotel have a jacuzzi.
- There is a seating area inside the room and in front of the door.
- Our room also has an electric kettle, television, air conditioning, free water, slipper, hotel guest amenities, safety deposit box, telephone, minibar, hair dryer and wifi.
- We have a free wake up service.
- There is underfloor heating system in the room.
History of Our Room 514
This part of the site was fairly demolished by erosion. The roofs and front walls of rooms 512, 513, 514 were non existent. To maintain Greek Architecture arches were used for major support systems. İn areas of two room design the first room, bedroom was originally a combined utility room and stable. The present bathroom was the sleeping quarters. We were given leeway to extend bathrooms and you are fortunate to have your own HAMAM. Take advantage of walking up the valley behind your room. Take advantage of the evening sunset by simply taking your outdoor chair and grabbing a beverage and moving to the edge of the property. The walls were cleaned by using a hammer resembling a geologists pick. The rough surfaces help the oxidization process which allows the stone to harden. A smooth surface would tend to collect moisture and cause flaking. This is the way the walls were done hundreds of years ago. You will also notice holes bored into ceilings of all bathrooms and some other rooms. These enhance air circulation which is necessary in preservation of the cave surfaces. Without ventilation moisture would collect and the walls and ceilings would deteriorate. The bed, desk, closet doors and windows frames were made on site. Stones were also sized on site. Construction started in Kasım 2009. Standing at the bottom of the stairs the area to left of the restaurant, the restaurant and reception buildings as well as all the rooms accessible via the stairs and extending all the way to the right were completed and ready for opening in February 2011. The areas above the main patio level and to left of the restaurant were faced during the same interval. At one time there were 70 workers on site.